What to Have Ready Before Calling or Requesting Bids
Whether you are calling the Village about permit requirements or gathering contractor bids, having the following information organized before you make contact saves time and produces more accurate answers.
About the property: Full street address so the Village can confirm jurisdiction; property type (single-family, condo, commercial, HOA community); current garage door dimensions and opening type.
About the project: A plain-language description of the work—replacement, new installation, storm damage repair, structural repair, or opener change. Photos of existing conditions or damage, if storm-related. A rough estimate of project value, even if preliminary.
About the contractor: The name and license number of the contractor you are considering, so you can check their Village registration and state license status before committing. Any door model or specification sheet if you already have a product in mind.
Other documents: HOA approval letter or ARC ruling if your community requires it. Any existing permit records that may be relevant to the current scope of work.